We have a fairly unique scenario w/our ZENWorks environments. We're running BOTH ZCM 11 and ZFD 7 in parallel for our Windows 7 and Windows XP management respectively. As such, network-assigned work-to-do gets confused amongst the two active pre-boot servers in our environment.
Anyway to control which server should answer the work-to-do request besides using boot CD's which point to their proper server? Can I control the priority/sequence somehow? Shutting one or the other server down at the time isn't a viable option. Thanks for any help.
Anyway to control which server should answer the work-to-do request besides using boot CD's which point to their proper server? Can I control the priority/sequence somehow? Shutting one or the other server down at the time isn't a viable option. Thanks for any help.